Update: Sept 10, 2007 (8:30 am)
Randall Road --
PLEASE PROCEED THRU THE WORK ZONES WITH CAUTION.
Planned work for the week includes
Randall Road - Excavating and grading for the bike path to the north of Dean St. on the west side of Randall Rd. Continuing traffic signal installation at IL 64. Adjusting structures in the asphalt pavement. Grinding existing asphalt pavement, north and south of the new concrete pavement for resurfacing.
IL Rte 64 - Grinding asphalt pavement for resurfacing west of Barbara Ann Dr. and east of Randall Rd. Adjusting underground structures for resurfacing.
Dean Street - Grinding asphalt pavement for resurfacing east and west of Randall Rd. within project limits.
Randall Road traffic is now in full Stage III configuration with traffic split to the east and west sides of the road utilizing new pavement.
Traffic on IL 64 within the project limits is split to the north and south sides of the roads utilizing new pavement.
Dean Street is in the proposed final lane configuration.
|