Client

Metra

Owner

Metra

Project Cost

$1,400,000.00

Market Sector

Transportation

Expertise

Construction Engineering, Railroads, Structural

27th Street Pedestrian Bridge Replacement

Chicago, Illinois

  • V3 provided construction-phase services for bridge replacement from the 27th Street Metra Station platform over railway tracks to the street level.

  • Scope included the removal of the existing substructure and superstructure and installation of prefabricated steel bridge on the newly installed foundations.

  • Bridge replacement tasks were done during the night and weekend hours to avoid station closures.

  • Services included construction inspection, construction observation, project documentation, shop drawing review, cost control, schedule analysis, public relations and materials testing.