Client

Geneva Construction

Owner

Illinois Department of Transportation

Project Cost

$1,100,000

Market Sector

Transportation

Expertise

Contracting & Construction Management

IDOT US Route 30 at Dugan Road Underground Utilities Improvements

Sugar Grove, Illinois

Geneva Construction engaged V3 to perform the box culvert and storm sewer installations for the road reconstruction and widening of US Route 30 at Dugan Road. Approximately 10,000 linear feet of US Route 30 was widened and reconstructed while maintaining traffic flow on the road during construction. The work was constructed in phases, utilizing sheet pile down the centerline of the roadway and constructing one-half of the box culvert at a time. Stormwater drainage was maintained through bypass pumping from the ditch into temporary storm sewer installed under the roadway. A detailed in-stream work plan was generated and permitted through IDOT and the Kane-DuPage Soil and Water Conservation District.