V3 is providing Phase I design services for corridor improvements which include the widening and resurfacing for two miles of Theodore Street from Drauden Road to IL Route 59.
-
To improve safety, a fifth, median/left turn lane will be added to assist traffic flow on Theodore Street and potentially decrease the number and severity of accidents.
-
Two new traffic signals will be installed at the intersections with Drauden Road and Wesmere Parkway.
-
We anticipate replacing the street lighting system with new LED street lights. An evaluation of the existing equipment will be performed to identify any reusable items.
-
Our design will also correct existing accessibility issues as well as minimize right-of-way acquisitions and utility relocations.
-
The project will follow the IDOT federal processing in anticipation of federal construction funding. Motor Fuel Tax funds will be utilized for Phase I and Phase II engineering.
Client
City of Joliet
Owner
City of Joliet