
Taylor Street Flood Forecasting V3FR
Frequent high-water conditions along the Chicago River placed ComEd’s TSS153 Taylor Street substation at ongoing risk, especially when elevated Lake …

Melvina Ditch Reservoir Expansion
Our water engineering experts were selected by the MWRD of Greater Chicago to help reduce the area’s flooding risk by increasing the reservoir’s …

Lacey Creek Watershed Plan
Frequent flooding and aging drainage infrastructure in the Lacey Creek watershed created a need for a comprehensive plan to improve community safety …

Stormwater Master Plan for Roberts Road Drainage Area
Our team is providing engineering services to develop a comprehensive stormwater study and master plan for five interconnected sub‑watersheds, with …

DuPage County Campus Flood Proofing Design Services
The DuPage County campus in Wheaton is located adjacent to Winfield Creek and receives stormwater runoff from several hundred upstream acres, making …

Country Club Highlands Drainage Improvements
The Country Club Highlands neighborhood experienced recurring flooding at the Emroy Avenue and Victory Parkway intersection, repeatedly causing damage …

Sugar Creek Watershed Storm Sewer Analysis
We partnered with the Village of Villa Park to analyze and address persistent flooding issues within the Sugar Creek watershed, which spans 4.2 square …

PTB 192-010 Phase I Studies for Five Structures Crossing Waterways
The purpose of this effort was to assess existing conditions, evaluate hydraulic performance, and develop replacement strategies that meet IDOT …

Parker Civic Center
This 50,000-square-foot civic center showcases a blend of thoughtful design and community collaboration. V3 was instrumental in the site design, …

Highland Park Apartments
This modern mixed-use residential complex offers high-quality living spaces with convenient access to urban amenities.

Academy for Global Citizenship
This project reduces typical water consumption by 50% and removes 1.5 million gallons of rainwater from combined sewers, won the AIA Illinois 2024 …

City Way Phase II
Our team provided comprehensive site design and civil engineering services for the $110-million second phase of CityWay, a mixed-use urban infill …




