• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Commercial
      • Education
      • Golf
      • Healthcare
      • Hospitality & Resorts
      • Industrial Compliance
      • Industrial Development
      • Mixed Use
      • Office
      • Retail
    • Government & Municipal
    • Parks, Recreation & Conservation
    • Power & Energy
    • Residential
      • Master Planned Communities
      • Multifamily
      • Mixed Use
      • Single Family Communities
    • Transportation
      • Rail & Intermodal
      • Transportation Agencies
  • Services
    • Construction
      • Construction Engineering
      • Ecological Restoration
      • Heavy Construction
      • Wetlands & Ecology
    • Land Development
      • Environmental
      • Floodplain & Stormwater
      • Land Surveying
      • Landscape Architecture
      • Planning
      • Site Civil
      • Transportation Planning & Design
      • Wetlands & Ecology
    • Planning & Landscape Architecture
      • Landscape Architecture
      • Planning
    • Transportation
      • Construction Engineering
      • Environmental
      • Land Surveying
      • Railroad
      • Structural
      • Transportation Planning & Design
      • Wetlands & Ecology
    • Water & Environment
      • Ecological Restoration
      • Environmental
      • Floodplain & Stormwater
      • Water Supply
      • Wastewater
      • Wetlands & Ecology
  • Careers
  • News
  • Contact
Projects

Our vast project portfolio has made us experts across industries, bringing you the skill, guidance, and overall value your project deserves. Partner with our team and see your vision come to life.

5U5A6880
20190808_105224
6edit
A4a
previous arrow
next arrow
  • Service Type:

  • Markets:

  • Region:

Theodore Street Corridor Improvements Phase I & II

To address growing traffic demands and improve safety, we partnered with the City of Joliet to design and engineer improvements for two miles of …

View ProjectTheodore Street Corridor Improvements Phase I & II

26th Street & Ridgeland Avenue Access to Transit

To enhance pedestrian and bicyclist safety and improve access to transit, the City of Berwyn initiated improvements along the 26th Street and …

View Project26th Street & Ridgeland Avenue Access to Transit

Wolf Road Shared-Use Path Design

The Wolf Road Shared-Use Path project enhances pedestrian safety and connectivity by linking Ogden Avenue (US Route 34) to the Bemis Woods Forest …

View ProjectWolf Road Shared-Use Path Design

Lakeview Crescent Rehabilitation

This utility and roadway replacement project involved replacing 650 meters of watermain, 550 meters of sanitary sewer, 46 lot services, relining 60 …

View ProjectLakeview Crescent Rehabilitation

River Point at Sheridan

The project involved designing a 244-foot-long, two-span roadway bridge over the South Platte River as part of a major retail development.

View ProjectRiver Point at Sheridan

I-57 at Division Street Interchange Reconstruction

The I-57 at Division Street Interchange Reconstruction project in Manteno, Illinois, aims to address ongoing regional growth and existing geometric …

View ProjectI-57 at Division Street Interchange Reconstruction

Elgin O’Hare Western Access (Illinois Route 390 & I-490 Tollway)

The Elgin O’Hare Western Access Project aims to connect Chicagoland like never before. Driven by the need to reduce traffic and enhance access to …

View ProjectElgin O’Hare Western Access (Illinois Route 390 & I-490 Tollway)

Bliss Road, Main Street & Fabyan Parkway Intersection Improvements

This award-winning project improved safety and relieved traffic congestion by creating an oval-shaped, single-lane roundabout.

View ProjectBliss Road, Main Street & Fabyan Parkway Intersection Improvements

US Route 30 Canadian National Railroad Grade Separation

Higher train volumes, significant increases in traffic congestion, and safety concerns led the Illinois Department of Transportation to seek …

View ProjectUS Route 30 Canadian National Railroad Grade Separation

Jane Addams Memorial Tollway (I-90) Reconstruction

As part of the Illinois Tollway’s $1.6 billion reconstruction of the I-90 East Corridor from the Elgin Toll Plaza to the Kennedy Expressway, our team …

View ProjectJane Addams Memorial Tollway (I-90) Reconstruction

Hainesville Road Improvements

The 1.5-mile-long section of Hainesville Road from Washington Street to Rollins Road in Lake County, IL currently experiences mobility and operational …

View ProjectHainesville Road Improvements

Downtown Lockport Revitalization

To transform downtown Lockport, IL into a vibrant, welcoming shopping and entertainment district, extensive revitalization efforts were needed.

View ProjectDowntown Lockport Revitalization

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Denver, CO
Chicago, IL
West Chicago, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC
Pinehurst, NC

Cincinnati, OH
Columbus, OH
Greenville, SC
Sherwood Park, AB

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2026 V3 Companies | Privacy Policy