Edmonton Metropolitan Region Board
Edmonton Metropolitan Region Board (EMRB) is made up of 13 municipalities that are required to align with multiple regional policy documents that …

Sturgeon Valley ASP
The Edmonton Capital Region recently adopted a growth plan which directed Sturgeon County, its bordering municipalities, and the Canadian Forces Base …

37th Street Sewer Improvements
The 37th Street sewer project was part of Chicago’s ambitious $7-billion “Building a New Chicago” infrastructure improvement program.

Beach Park Streambank & Bluff Stabilization
In Beach Park, IL, a 220-linear-foot streambank section of Bull Creek was eroding, causing the bluff slope to become unstable.

Mahoney Creek Tributary Detention Basin
Our team was hired for the establishment and improvement of two stormwater detention basins along the Mahoney Creek Tributary.

Hebron Hydrologic & Hydraulic Floodplain
The Village of Hebron partnered with our team to address heavy flood events frequently affecting their community.

Agri-Business Multi-Criterion Decision Analysis
Several companies interested in investing in large agri-business processing facilities posed a potential challenge in their need to utilize as much as …

EPA Lebanon Brownfield Assessment
Our team is assisting the City of Lebanon with a $150,000 US EPA Brownfield Community-wide Assessment Grant project to help clean up abandoned, …

Downtown Lockport Streetscape Plan
To transform downtown Lockport, IL into a vibrant, welcoming shopping and entertainment district, extensive revitalization efforts were needed.

IL Route 171 & New Avenue Feasibility Study & Phase I
IL Route 171 needed to address safety and capacity concerns associated with an unsignalized, three-leg intersection.

153rd Street & Ravinia Avenue Intersection Improvements
The intersection at 153rd Street and Ravinia Avenue in Orland Park was experiencing a high level of accidents due to distracted drivers stopping at a …

Skokie Drainage Ditch Phase 1 & Skokie Drainage Ditch Improvements-PH2
The Skokie River—a 20-mile-long waterway winding through Chicago’s northern suburbs—was facing stabilization issues and severely eroding streambanks …

St. Charles Road Bridge
The St. Charles Road bridge was suffering from deterioration, leaving it in poor condition for travelers crossing the Salt Creek.

Repairs of 71st Street & 83rd Street Bridges over Veterans Memorial Tollway (I-355)
When our team was hired for the construction engineering of a 12.5-mile extension of Illinois’ Veterans Memorial Tollway (I-355), we were presented …

Blackberry Creek Headwaters Mitigation Bank, Campton Township
Campton Township purchased the 220-acre Blackberry Creek Headwaters Conservation Area in 2001 as part of their $18.7 Million Open Space Land …

West Side Neighborhood Storage Contract #2
The west side of Wilmette was prone to frequent flooding, causing transportation delays and property damage. The Village hired our team to install 10 …

Tinley Creek Streambank Stabilization
The Metropolitan Water Reclamation District of Greater Chicago partnered with our team to complete t flood control and streambank stabilization on …

Combined Sewer Overflow Longterm Control Plan Wet Weather Treatment
This $33.4-million project is the current phase of the City of Joliet’s Combined Sewer Overflow Long Term Control Plan to remedy issues within its …

West Water Street Reconstruction
The Village of Baltimore, OH wanted to improve a 0.3-mile roadway alongside its local fire station and Liberty Union High School by providing …

Rager Road Waterline, Sanitary Sewer & Lift Station
Our municipal services team in Columbus provided design and permitting for the Rager Road Waterline, Sanitary Sewer & Lift Station, a $1.4-million …

Mecklenburg County District Attorney Building
The Mecklenburg District Attorney Building along 4th Street aimed to make its front plaza a more inviting space for visitors. Located across from the …

Hope Drive Extension
The Village of Hebron needed secondary roadway access to a large residential development, as the previous access point experienced frequent flooding. …

Farrell Road Path
In Lockport, IL, a half-mile stretch of Farrell Road needed improvements to support pedestrians traveling to and from Lockport Township High School …

Danville Wastewater Treatment Facility
As the Village of Danville’s wastewater treatment facility approached 25 years old, the Ohio EPA imposed new discharge limits on the facility …

167th Street Multi-Use Path
As part of the Village of Orland Park’s 2040 Transportation Plan, a new one-mile, multi-use path along 167th Street was proposed to connect the …