River Point at Sheridan

The project involved designing a 244-foot-long, two-span roadway bridge over the South Platte River as part of a major retail development. This composite concrete deck on concrete bulb tee girder structure accommodates three traffic lanes and includes architectural enhancements such as a decorative lighted monument column and a sidewalk overlook at the bridge’s midpoint. The design addressed challenges posed by corrosive soils and aggressive scour conditions. Additionally, the project included designing new substructures for relocating an existing 231-foot-long steel prefabricated truss pedestrian bridge. This project was honored with the Engineering News Record Best of 2009 Projects Award in the environmental category.





Owner
Miller Wingarten Realty, LLC
Market Sector
RetailPrimary Service Lines
Highways & Traffic, Site Civil, Structural, SurveyingRegion
DenverRelated Projects

Walker Station Land Planning
Walker Station was envisioned as the first Traditional Neighborhood Development (TND) in Pinehurst and Moore County, setting a new benchmark for …

Briggs Ranch Addition
Expanding lodging and amenities to elevate the member experience, this project introduced nine new casitas that complement the existing accommodations …

Pinehurst Sandmines Golf Resort
Pinehurst Resort set out to create its first new golf course in nearly 30 years as part of a bold vision for a dynamic new golf destination.

Morganton Park South
Pine Ridge at Morganton Park South was envisioned as a dynamic mixed-use destination that combines retail, dining, office space, and multi-family …
