• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Healthcare
    • Local Government
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

Skokie Drainage Ditch Phase I & II Improvements

The Skokie River—a 20-mile-long waterway winding through Chicago’s northern suburbs—was facing stabilization issues and severely eroding streambanks along a one-mile section in Lake Forest. Our team was hired for water management services that would protect private properties and infrastructure from erosion-based damage. We approached this challenge by segmenting the project into two distinct work zones (downstream and upstream), allowing for completion of half the creek at a time. Through attention to actual field condition during construction, we were able to provide value engineered solutions which resulted in $250,000 in cost savings for the East Skokie Drainage District. 

Owner

East Skokie Drainage District

Market Sector

Local Government

Primary Service Lines

Contracting & Construction Management, Environmental

Region

Chicago
Additional Info

Project Highlights:

  • Stabilization efforts included: 
    • 2,300 linear feet of gabion basket walls ranging from 4.5 to 9.0 feet tall
    • 2,640 linear feet of log toe stabilization
    • 1,060 linear feet of log toe/riprap stabilization
    • 3,986 linear feet of gabions
    • 5,344 linear feet of natural or stone toe protection
    • 936 linear feet of bank reshaping
  • As part of the construction process, we conducted a soil sampling for clean construction demolition debris disposal of excess soils generated from the installation of gabions.

Related Projects

West Side Neighborhood Storage Contract #2

The west side of Wilmette was prone to frequent flooding, causing transportation delays and property damage. The Village hired our team to install 10 …

View ProjectWest Side Neighborhood Storage Contract #2

Prince Pond Dredging & Park Improvements

Prince Pond had lost some of its stormwater storage capacity due to sediment accumulation. We self-performed the dredging of the pond, and during …

View ProjectPrince Pond Dredging & Park Improvements

Leonard Park Drainage Improvement Study

With a recent increase in demand for buildable lots within the subdivision, the Franklin County Engineer’s Office hired our team to perform a flood …

View ProjectLeonard Park Drainage Improvement Study

Tinley Creek Streambank Stabilization

The Metropolitan Water Reclamation District of Greater Chicago partnered with our team to complete t flood control and streambank stabilization on …

View ProjectTinley Creek Streambank Stabilization

Mahoney Creek Tributary Detention Basin

Our team was hired for the establishment and improvement of two stormwater detention basins along the Mahoney Creek Tributary.

View ProjectMahoney Creek Tributary Detention Basin

The Vision to Transform with Excellence.

Celebrating 40 years of transforming careers, communities, and environments.

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Chicago, IL
Villa Park, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC

Cincinnati, OH
Columbus, OH
Sherwood Park, AB
Port-au-Prince

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2025 V3 Companies | Privacy Policy