• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Healthcare
    • Local Government
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

West Branch Forest Preserve Wetland, Fen, & River Restoration

This complex, multi-year project involved the restoration of a 350-acre area within a forest preserve including a one-mile section of the West Branch of the DuPage River, 158 acres of wetlands, a 34-acre fen, and adjacent prairie and savanna communities. Project goals included improving stormwater management, enhancing aquatic and terrestrial habitat, and reducing invasive species pressure to allow native communities to establish. The river restoration posed a daunting challenge, requiring a solution that involved diverting the existing river while accommodating 100-year storm event volumes. We restored the river in phases, building lined diversion channels along the length of the river, addressing erosion issues, stabilizing the banks, and enhancing wetland hydrology by connecting the river to the floodplain.

Owner

DuPage County Department of Stormwater Management

Market Sector

Parks, Recreation & Conservation

Primary Service Lines

Contracting & Construction Management, Ecological Restoration, Wetlands & Ecology

Region

Chicago
Additional Info

Project highlights:

  • Proximity Park is a three-story, 204,263 SF, office building on 32 acres.

Related Projects

Spring Brook Creek No. 1 Restoration

Our team was retained under two separate contracts for the restoration of more than 1.5 miles of Spring Brook Creek running through both the Blackwell …

View ProjectSpring Brook Creek No. 1 Restoration

Blackberry Creek Headwaters Mitigation Bank, Campton Township

Campton Township purchased the 220-acre Blackberry Creek Headwaters Conservation Area in 2001 as part of their $18.7 Million Open Space Land …

View ProjectBlackberry Creek Headwaters Mitigation Bank, Campton Township

Beach Park Streambank & Bluff Stabilization

In Beach Park, IL, a 220-linear-foot streambank section of Bull Creek was eroding, causing the bluff slope to become unstable.

View ProjectBeach Park Streambank & Bluff Stabilization

Gray Willows Wetland Mitigation Bank

The Gray Willows Wetland Mitigation Bank involved the design, permitting, construction, and ecological management of 95 acres of open space owned by …

View ProjectGray Willows Wetland Mitigation Bank

Skokie Drainage Ditch Phase I & II Improvements

The Skokie River—a 20-mile-long waterway winding through Chicago’s northern suburbs—was facing stabilization issues and severely eroding streambanks …

View ProjectSkokie Drainage Ditch Phase I & II Improvements

The Vision to Transform with Excellence.

Celebrating 40 years of transforming careers, communities, and environments.

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Chicago, IL
Villa Park, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC

Cincinnati, OH
Columbus, OH
Sherwood Park, AB
Port-au-Prince

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2025 V3 Companies | Privacy Policy