• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Healthcare
    • Local Government
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

Thorn Creek Headwaters Preserve Mitigation Bank

Wetland & Stream

Credits for Sale

Contact Us Today

V3 Companies and the Forest Preserve District of Will County are proud to announce the approval of the Thorn Creek Headwaters Preserve Wetland and Stream Mitigation by the US Army Corps of Engineers. 

Support Local Ecosystems

Ensures that ecological impacts are mitigated and to preserve the natural balance.

Regulatory Efficiency

Thorn Creek Preserve Mitigation Bank meets all specific environmental guidelines.

Community Benefits

A trail that offers a fun experience of the restored property and its preservation.

Support Local Ecosystems

Ensures that ecological impacts are mitigated and to preserve the natural balance.

Regulatory Efficiency

Thorn Creek Preserve Mitigation Bank meets all specific environmental guidelines.

Community Benefits

Enhance biodiversity and natural resources that directly impact local residents and businesses.

Cost
Effectiveness

Local credits help you avoid the complexities of finding mitigation solutions outside the region.

We provide both wetland and stream mitigation for unavoidable impacts to wetlands and stream authorized by the US Army Corps of Engineers.  The mitigation bank provides a total of 163.92 wetland credits and 1,151 linear feet of stream credits. 

Connect With Our Mitigation Banking Leaders

Our leaders are ready to discuss our mitigation banking credit availability as well as our ability to assist you with any design, permitting, construction, or management needs for any of your own restoration or mitigation banking projects.

Tom Slowinski, PWS

Wetlands & Ecology Technical Director

Download vCard

Scott J. Brejcha, PWS

Chicago Wetland & Ecology Leader

Download vCard

Related Projects

Blackberry Creek Headwaters Mitigation Bank, Campton Township

Campton Township purchased the 220-acre Blackberry Creek Headwaters Conservation Area in 2001 as part of their $18.7 Million Open Space Land …

View ProjectBlackberry Creek Headwaters Mitigation Bank, Campton Township

Beach Park Streambank & Bluff Stabilization

In Beach Park, IL, a 220-linear-foot streambank section of Bull Creek was eroding, causing the bluff slope to become unstable.

View ProjectBeach Park Streambank & Bluff Stabilization

Tinley Creek Streambank Stabilization

The Metropolitan Water Reclamation District of Greater Chicago partnered with our team to complete t flood control and streambank stabilization on …

View ProjectTinley Creek Streambank Stabilization

Fort Sheridan Public Access Improvements

The Fort Sheridan Forest Preserve is ideally located along the Lake Michigan shoreline, offering 250 acres of savanna, ravine, and lakefront …

View ProjectFort Sheridan Public Access Improvements

Fox Valley Park District Native Management

This multi-year project included the overall native area maintenance of 12 facilities located within the Fox Valley Park District, totaling more than …

View ProjectFox Valley Park District Native Management

Prince Pond Dredging & Park Improvements

Prince Pond had lost some of its stormwater storage capacity due to sediment accumulation. We self-performed the dredging of the pond, and during …

View ProjectPrince Pond Dredging & Park Improvements

Spring Brook Creek No. 1 Restoration

Our team was retained under two separate contracts for the restoration of more than 1.5 miles of Spring Brook Creek running through both the Blackwell …

View ProjectSpring Brook Creek No. 1 Restoration

Billinger Stream Stabilization

The Billinger Stream in Paulding, OH needed attention as its banks were in jeopardy. Increased localized sedimentation into the creek was causing …

View ProjectBillinger Stream Stabilization

The Vision to Transform with Excellence.

Celebrating 40+ years of transforming careers, communities, and environments.

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Denver, CO
Chicago, IL
West Chicago, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC
Pinehurst, NC

Cincinnati, OH
Columbus, OH
Greenville, SC
Sherwood Park, AB

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2025 V3 Companies | Privacy Policy