• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Commercial
      • Education
      • Golf
      • Healthcare
      • Hospitality & Resorts
      • Industrial Compliance
      • Industrial Development
      • Mixed Use
      • Office
      • Retail
    • Government & Municipal
    • Parks, Recreation & Conservation
    • Power & Energy
    • Residential
      • Master Planned Communities
      • Multifamily
      • Mixed Use
      • Single Family Communities
    • Transportation
      • Rail & Intermodal
      • Transportation Agencies
  • Services
    • Construction
      • Construction Engineering
      • Ecological Restoration
      • Heavy Construction
      • Wetlands & Ecology
    • Land Development
      • Environmental
      • Floodplain & Stormwater
      • Land Surveying
      • Landscape Architecture
      • Planning
      • Site Civil
      • Transportation Planning & Design
      • Wetlands & Ecology
    • Planning & Landscape Architecture
      • Landscape Architecture
      • Planning
    • Transportation
      • Construction Engineering
      • Environmental
      • Land Surveying
      • Railroad
      • Structural
      • Transportation Planning & Design
      • Wetlands & Ecology
    • Water & Environment
      • Ecological Restoration
      • Environmental
      • Floodplain & Stormwater
      • Water Supply
      • Wastewater
      • Wetlands & Ecology
  • Careers
  • News
  • Contact

Burt Ridge Waterline Replacements

This project resolved long-standing water quality issues—often reported as rusty water—in a 25-home subdivision with aging cast iron pipes dating back to the 1950s. We replaced the deteriorated waterlines with modern ductile iron pipe, upgraded hydrants and valves, and improved service reliability. Through innovative construction solutions and funding assistance, we delivered a cost-effective upgrade that restored safe, clean water for residents.

KEY CONTRIBUTIONS:

Waterline Replacement & Service Upgrades
We installed new six-inch ductile iron water pipe, added hydrants and valves, and transferred existing water services to the new system for improved performance.

Meter Relocation for Accessibility
We replaced outdated in-home water meters with new meter pits near the right-of-way, enhancing accessibility and reducing maintenance challenges.

Innovative Construction Solutions
We installed the new waterline under a state route using a jack-and-bore method. When unexpected utility conflicts arose, we coordinated with ODOT and the contractor to avoid pavement disturbance—preventing costly change orders.

Funding Assistance
We helped secure a grant through the County’s ARPA Water and Wastewater Infrastructure Program, covering 90% of construction costs and making this long-awaited project possible.



 

Project Location

Granville, Ohio

Client

Village of Granville

Market Sector

Government

Primary Service

Water Supply

State/Province

Ohio

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Denver, CO
Chicago, IL
West Chicago, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC
Pinehurst, NC

Cincinnati, OH
Columbus, OH
Greenville, SC
Sherwood Park, AB

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2026 V3 Companies | Privacy Policy