• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Healthcare
    • Local Government
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

Tri-State Tollway (I-294) Widening & Rehabilitation

V3 was the lead design firm for a key segment of the Illinois Tollway’s $4 billion improvement of the Central Tri-State Tollway (I-294), an ambitious project aimed at improving infrastructure and traffic flow.  Our Phase II design engineering services were performed for the widening and rehabilitation of nearly two miles of I-294, from Wolf Road to the O’Hare Oasis.  This included an expansive list of improvements such as the addition of a fifth travel lane in each direction, reconstruction of the median to accommodate flex lanes, the rehabilitation of the dual (over one-half mile long) bridges over the Bensenville Rail Yard, and the implementation of SmartRoad technology. In addition, a detailed traffic staging plan was developed to maintain four lanes of traffic in each direction throughout the three-year construction duration.

Owner

Illinois Tollway

Market Sector

Transportation

Primary Service Lines

Highways & Traffic, Structural

Region

Chicago
Additional Info

Project highlights: 

  • The proposed improvements included the rehabilitation of the two 28-span, half-mile long bridges over the Bensenville Rail Yard, rehabilitation of the Wolf Road bridge over I-294 and the reconstruction of the O’Hare Oasis ramps.
  • The proposed improvements include the installation of retaining walls and noise abatement walls, drainage improvements, the implementation of Intelligent Transportation System infrastructure, new roadway lighting, regulatory floodway/floodplain impacts and the relocation/protection of existing utilities.
  • Under newly developed Illinois Tollway guidance for soil waste screening, we completed special waste screening which included collecting soil samples as well as development of a soil management memo characterizing soils for disposal. In addition to the soil management memo, we evaluated potential environmental concerns with possible acquisition of right-of-way from an adjoining landfill property.
  • A detailed traffic staging plan was prepared to depict the maintenance of four lanes of mainline traffic in each direction along with the maintenance of ramp movements throughout the duration of construction. The project was phased over a three-year period from 2020 to 2022 and accommodated the staging of the new I-490 Tollway Interchange to the south.
  • A feasibility study was conducted for the future widening and reconstruction of the Bensenville Yard Bridge structures. The study included development of structural and geometric alternatives for new alignments that would facilitate staged construction. The alternatives were evaluated and a cost estimate was developed to prepare for future coordination with the railroad.

Related Projects

IL Route 171 & New Avenue Feasibility Study & Phase I

IL Route 171 needed to address safety and capacity concerns associated with an unsignalized, three-leg intersection.

View ProjectIL Route 171 & New Avenue Feasibility Study & Phase I

Jane Addams Memorial Tollway (I-90) Reconstruction

As part of the Illinois Tollway’s $1.6 billion reconstruction of the I-90 East Corridor from the Elgin Toll Plaza to the Kennedy Expressway, our team …

View ProjectJane Addams Memorial Tollway (I-90) Reconstruction

US Route 30 Canadian National Railroad Grade Separation

Higher train volumes, significant increases in traffic congestion, and safety concerns led the Illinois Department of Transportation to seek …

View ProjectUS Route 30 Canadian National Railroad Grade Separation

US Route 30 Reconstruction

This $90-million project for the Illinois Department of Transportation included the reconstruction and widening of 8.5 miles of US Route 30 from a …

View ProjectUS Route 30 Reconstruction

The Vision to Transform with Excellence.

Celebrating 40 years of transforming careers, communities, and environments.

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Chicago, IL
Villa Park, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC

Cincinnati, OH
Columbus, OH
Sherwood Park, AB
Port-au-Prince

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2025 V3 Companies | Privacy Policy