Rager Road Waterline, Sanitary Sewer & Lift Station
Our municipal services team in Columbus provided design and permitting for the Rager Road Waterline, Sanitary Sewer & Lift Station, a $1.4-million project to extend utilities in Canal Winchester, OH to properties planned for annexation. With an accelerated timeline set forth due to the development objectives in this part of town, we prioritized and streamlined the project through concurrent design efforts. This included a 6,000-linear-foot, 12-inch waterline extension; a 4,000-linear-foot, eight-inch sanitary force main; a 450-gallon-per-minute duplex submersible sanitary lift station; and 1,200 linear feet of gravity sanitary sewer. This project immediately provided service to two, 10-acre buildings serving the e-Commerce industry, fulfilling these important economic development goals for our client.
![](https://www.v3co.com/wp-content/uploads/2023/07/20210420_103259_resized-2048x1536.jpg)
![](https://www.v3co.com/wp-content/uploads/2023/07/20210420_103530_resized.jpg)
Project Manager
Mike Crane
Market Sector
Local GovernmentPrimary Service Lines
Site CivilRegion
ColumbusAdditional Info
Project highlights:
- Our creative routing design included directionally drilling portions of the project under jurisdictional waterways, which avoided the need for environmental permitting and allowed the project to achieve its aggressive schedule.
- Survey services included the preparation of annexation exhibits, topographic and utility survey, ALTA surveys, legal descriptions for easements, and construction layout services.
- Planning work for the immediate and surrounding tributaries was provided.
- Telemetry and controls were included as part of the lift station design.
- Our team managed the permitting process from application through issuance through ODOT, Ohio EPA and the local building department, achieving all project milestones.
- Services included preparation of Engineer’s Opinion of Probable Construction Costs and bidding assistance for the city.
Related Projects
![](https://www.v3co.com/wp-content/uploads/2024/06/IMG_5232-400x300.jpg)
Elgin O’Hare Western Access (Illinois Route 390 & I-490 Tollway)
As part of the Illinois Tollway’s $1.6 billion reconstruction of the I-90 East Corridor from the Elgin Toll Plaza to the Kennedy Expressway, our team …
![](https://www.v3co.com/wp-content/uploads/2024/06/DePaul-230915-115-5782-400x300.jpg)
DeVry University Chicago Campus
In order to breathe new life into the One Wells Fargo building and attract businesses and employees, the owner hired our team to revitalize its …
![](https://www.v3co.com/wp-content/uploads/2024/06/ct-updated-lincoln-yards-photos-20180315-016-enhanced-400x300.jpg)
Lincoln Yards Development
Our team is the lead environmental and infrastructure design firm for this multi-year transformative project, utilizing professionals from our …
![](https://www.v3co.com/wp-content/uploads/2023/12/DJI_0998_edited-1-400x300.jpg)
John Humphrey Sports Complex Renovation
For this award-winning project, the Village of Orland Park hired our team to redesign the John Humphrey Sports Complex fields, addressing …