• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Commercial
      • Education
      • Golf
      • Healthcare
      • Hospitality & Resorts
      • Industrial Compliance
      • Industrial Development
      • Mixed Use
      • Office
      • Retail
    • Government & Municipal
    • Parks, Recreation & Conservation
    • Power & Energy
    • Residential
      • Master Planned Communities
      • Multifamily
      • Mixed Use
      • Single Family Communities
    • Transportation
      • Rail & Intermodal
      • Transportation Agencies
  • Services
    • Construction
      • Construction Engineering
      • Ecological Restoration
      • Heavy Construction
      • Wetlands & Ecology
    • Land Development
      • Environmental
      • Floodplain & Stormwater
      • Land Surveying
      • Landscape Architecture
      • Planning
      • Site Civil
      • Transportation Planning & Design
      • Wetlands & Ecology
    • Planning & Landscape Architecture
      • Landscape Architecture
      • Planning
    • Transportation
      • Construction Engineering
      • Environmental
      • Land Surveying
      • Railroad
      • Structural
      • Transportation Planning & Design
      • Wetlands & Ecology
    • Water & Environment
      • Ecological Restoration
      • Environmental
      • Floodplain & Stormwater
      • Water Supply
      • Wastewater
      • Wetlands & Ecology
  • Careers
  • News
  • Contact

Combined Sewer Overflow Longterm Control Plan Wet Weather Treatment

This $33.4-million project is the current phase of the City of Joliet’s Combined Sewer Overflow Long Term Control Plan to remedy issues within its oldest sanitary system. The construction of a wet weather treatment facility was proposed to address stormwater capacity, which included the construction of an 865-foot-long tunnel under the Des Plaines River requiring shafts, piping, and other ancillary sewer structures to complete. Because the project required a tunnel boring machine through bedrock 30 feet under the riverbed, several plans and precautions were implemented to investigate and plan for under-river conditions. Significant bypass pumping, staging, and sequencing of construction was necessary to complete the work and maintain operation of the existing combined sewer, including sewer flow diversion and bypass pumping.

Project Location

Joliet, Illinois

Client

City of Joliet

Market Sector

Government

Primary Service

Construction Engineering, Floodplain & Stormwater, Wastewater

State/Province

Illinois

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Denver, CO
Chicago, IL
West Chicago, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC
Pinehurst, NC

Cincinnati, OH
Columbus, OH
Greenville, SC
Sherwood Park, AB

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2026 V3 Companies | Privacy Policy