BMO Tower
BMO Tower is the local headquarters for BMO Harris Bank, occupying a third of the 46-story office building. A five-foot-diameter sewer conveying drainage from the Jane Byrne Interchange bisects the site before outfalling into the Chicago River. Due to construction, future maintenance, and liability concerns, the client, IDOT, and CDOT agreed to reroute the sewer into public right-of-way. To avoid flooding under the office tower, we designed a new bulkhead for the tunnel which was installed five-feet east of the building footprint. In addition, we assisted with right-of-way acquisition along Canal Street to expand the building footprint. As a result, Canal Street changed from two-way traffic to northbound only, so we designed the new traffic signal and lane configurations in conjunction with CDOT and Bureau of Electricity.



Owner
Goettsch Partners
Market Sector
Office & IndustrialPrimary Service Lines
Site CivilRegion
ChicagoAdditional Info
Project Highlight:
- The property, directly south of the CTA Transit Center, is two acres in size and is located in Chicago’s Southwest Loop District. Approximately one acre is the office tower footprint and the remaining area is an open plaza above a parking garage.
- The rerouted sewer crossed over an existing trolley tunnel and under the Amtrak pedestrian walkway connecting to Union Station. The trolley tunnel was originally constructed between 1890-1894 to allow horse-drawn carriages to cross under the Chicago River into the central business district.
Related Projects

Tri-State Tollway (I-294) Widening & Rehabilitation
Our team was the lead design firm of the Illinois Tollway’s $4 billion improvement of the Central Tri-State Tollway (I-294), an ambitious project …

300 S. Tryon Outdoor Terrace Garden
High above Uptown Charlotte sits a stunning 8,000 square foot rooftop deck, providing beautiful, 180-degree panoramic views of South End and BB&T …

Old Post Office Mixed-Use Redevelopment
The Old Post Office in Chicago is a national historic landmark, built in 1921 with many renovations over the course of its 100 years.

Edmonton Metropolitan Region Board
Edmonton Metropolitan Region Board (EMRB) is made up of 13 municipalities that are required to align with multiple regional policy documents that …