• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Golf
    • Healthcare
    • Hospitality & Resorts
    • Local Government
    • Master Planned Communities
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Land Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

Loyola Quinlan School of Business Administration

Loyola University Chicago’s Quinlan School of Business offers a nationally ranked business education. To create a world-class learning environment, the school sought accessibility and sustainability improvements to one of its buildings: a 14-story multi-use unit connecting to additional campus property. Located adjacent to the CTA Red Line, the front of the building needed ramp upgrades specified by the Chicago Department of Transportation, which required close coordination so as not to impact CTA facilities.  Additionally, a green roof system was developed through an innovative storm trap solution that helped the project achieve LEED Gold certification.

Market Sector

Education

Primary Service Lines

Site Civil

Region

Chicago
Additional Info

Project Highlights:

  • A private alley is located to the north of the site with access from Chestnut Street.  Coordination of the alley improvements was required between all the buildings that use it as access.
  • Stormwater detention was provided with a Storm Trap system.  Close coordination was required to fit the system within the proposed sheeting area and to prevent conflict with grade beams.
  • Stormwater volume control was provided by reducing the amount of impervious area via green roof system.
  • CDOT required that the corner ramps within the frontage of the site and the receiving ramps across the street be upgraded to the current standards.  Both receiving ramps for the site were located adjacent to a CTA vents which required close coordination with CDOT to upgrade the ramp elevations without impacting the CTA facilities.

Related Projects

Mill Creek Bridge Inspections

As part of our ongoing partnership with Martin Marietta Materials, we developed and are implementing a Bridge Management Program (BMP) to ensure the …

View ProjectMill Creek Bridge Inspections

Union Pacific 3rd Mainline Track Addition

Union Pacific Railroad launched the addition of a third mainline track to address increasing freight volumes and alleviate congestion along the Geneva …

View ProjectUnion Pacific 3rd Mainline Track Addition

Bridge Inspections & Bridge Management Program

We developed and are currently implementing a Bridge Management Program (BMP) for two pile-supported bridges on the Sidney Lowe Railroad near Sidney, …

View ProjectBridge Inspections & Bridge Management Program

Indiana Sugars Track Design

To enable a new lead track into Indiana Sugars’ future rail yard while safely crossing four buried gas pipelines, we delivered an integrated civil, …

View ProjectIndiana Sugars Track Design

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Denver, CO
Chicago, IL
West Chicago, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC
Pinehurst, NC

Cincinnati, OH
Columbus, OH
Greenville, SC
Sherwood Park, AB

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2026 V3 Companies | Privacy Policy