![](https://www.v3co.com/wp-content/uploads/2024/06/IMG_0020-400x300.jpg)
West Branch Forest Preserve Wetland, Fen, & River Restoration
Durkees Run Stormwater Park transformed underutilized tennis courts into a multifunctional space benefiting Lafayette area residents and the adjacent …
![](https://www.v3co.com/wp-content/uploads/2023/08/Asphalt-Trail-400x300.jpg)
Fort Sheridan Public Access Improvements
The Fort Sheridan Forest Preserve is ideally located along the Lake Michigan shoreline, offering 250 acres of savanna, ravine, and lakefront …
![](https://www.v3co.com/wp-content/uploads/2023/08/Finish-Slope-from-Creek-Bottom_8-400x300.jpg)
Beach Park Streambank & Bluff Stabilization
In Beach Park, IL, a 220-linear-foot streambank section of Bull Creek was eroding, causing the bluff slope to become unstable.
![](https://www.v3co.com/wp-content/uploads/2023/08/Blackberry-Campton-Aerial-400x300.jpg)
Blackberry Creek Headwaters Mitigation Bank, Campton Township
Campton Township purchased the 220-acre Blackberry Creek Headwaters Conservation Area in 2001 as part of their $18.7 Million Open Space Land …
![](https://www.v3co.com/wp-content/uploads/2023/08/4E4D21A5-28F1-4F96-B5F9-189579EDEC38_20160127075129_photo-1453989054-3-400x300.jpg)
Tinley Creek Streambank Stabilization
The Metropolitan Water Reclamation District of Greater Chicago partnered with our team to complete t flood control and streambank stabilization on …
![](https://www.v3co.com/wp-content/uploads/2023/08/Indian-Creek-400x300.jpg)
Fox Valley Park District Native Management
This multi-year project included the overall native area maintenance of 12 facilities located within the Fox Valley Park District, totaling more than …
![](https://www.v3co.com/wp-content/uploads/2023/08/fav-400x300.jpg)
Prince Pond Dredging & Park Improvements
Prince Pond had lost some of its stormwater storage capacity due to sediment accumulation. We self-performed the dredging of the pond, and during …
![](https://www.v3co.com/wp-content/uploads/2023/08/IMG_2280-400x300.jpg)
Spring Brook Creek No. 1 Restoration
Our team was retained under two separate contracts for the restoration of more than 1.5 miles of Spring Brook Creek running through both the Blackwell …
![](https://www.v3co.com/wp-content/uploads/2023/08/Bridge-over-Gordan-Creek-400x300.jpg)
Billinger Stream Stabilization
The Billinger Stream in Paulding, OH needed attention as its banks were in jeopardy. Increased localized sedimentation into the creek was causing …