• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Healthcare
    • Local Government
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

Substation Flood Proofing

As part of a utility company’s resiliency initiative to improve power supply reliability, we designed flood proofing modifications for various at-risk substations located within the floodway/floodplain associated with different flooding sources and waterways. To minimize subsurface utility conflicts, the design at some substation flood walls included a precast concrete block wall system wrapped with an impermeable ethylene propylene diene monomer liner. Other design aspects included ingress/egress openings equipped with a removable flood plank system and a pump station to handle interior drainage. Our flood proofing improvements were fast tracked and involved extensive coordination and permitting with DuPage County, the Metropolitan Water Reclamation District of Greater Chicago, and the Illinois Department of Natural Resources Office of Water Resources.

Owner

Utility Company

Market Sector

Power & Energy

Primary Service Lines

Resilient Water Solutions

Region

Chicago
Additional Info

Project Highlights:

  • Planned wall height considered both regulatory and best available data flood elevation information and was designed to protect the substation to an elevation of more than one foot above the flood insurance study’s 500-year flood elevation.
  • We have performed flood proofing feasibility and design services at the following substations:
    • TDC555 Glen Ellyn
    • TSS121 Freeport
    • TSS192 Ridgeland
    • TDC414 Roberts Road
    • TDC557 Butterfield
    • TSS69 North Chicago
    • DCS66 Pontiac
    • TSS46 Des Plaines
    • TSS107 Dixon
    • TDC566 Oak Brook
    • TDC580 Downers Grove
    • TSS64 Bellwood
    • TSS153 Taylor Street

Related Projects

Norton Crossing

This project is designed to breathe new life into the area by demolishing over 18 acres of condemned housing and creating a new apartment complex, a …

View ProjectNorton Crossing

Parker Civic Center

This 50,000-square-foot civic center showcases a blend of thoughtful design and community collaboration. V3 was instrumental in the site design, …

View ProjectParker Civic Center

Highland Park Apartments

This modern mixed-use residential complex offers high-quality living spaces with convenient access to urban amenities.

View ProjectHighland Park Apartments

North Street Reconstruction & Integrated Stormwater Management

The North Street project not only addresses stormwater management but also serves as a catalyst for neighborhood revitalization and economic …

View ProjectNorth Street Reconstruction & Integrated Stormwater Management

The Vision to Transform with Excellence.

Celebrating 40 years of transforming careers, communities, and environments.

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Chicago, IL
Villa Park, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC

Cincinnati, OH
Columbus, OH
Sherwood Park, AB
Port-au-Prince

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2025 V3 Companies | Privacy Policy