• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Healthcare
    • Local Government
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

37th Street Sewer Improvements

The 37th Street sewer project was part of Chicago’s ambitious $7-billion “Building a New Chicago” infrastructure improvement program. The objective of this project was to reduce the number of storm overflows by increasing the combined sewer capacity for an area on the north side of McKinley Park. This included the installation of approximately 1,000 feet of 84-inch-diameter jacked in place sewer, 4,000 feet of up to 84-inch-diameter sewer, as well as tumbling basins, large connection structures, and private drain connections. A unique challenge was reconstructing the sewers and arterial streets in the midst of business and residential areas, requiring close coordination of street closures and service interruptions.

Market Sector

Local Government

Primary Service Lines

Construction Engineering

Region

Chicago
Additional Info

Project highlights:

  • The downstream outlet for the new 84-inch sewer required a new connection structure was installed into an existing 100-year, 12-foot by 14-foot overflow tunnel.
  • Incidental construction activities included capping and reconnecting watermains, reconstructing roadway pavement, patching pavement, removing and replacing concrete sidewalks, driveways, curbs and gutters, installing ADA compliant ramps, and restoring landscape restoration.
  • The project streets are located in arterial business and residential areas, requiring coordination of street closures and service interruptions.
  • V3 coordinated all work with Alderman’s offices, various city services departments, businesses, and residents.

Related Projects

Norton Crossing

This project is designed to breathe new life into the area by demolishing over 18 acres of condemned housing and creating a new apartment complex, a …

View ProjectNorton Crossing

Parker Civic Center

This 50,000-square-foot civic center showcases a blend of thoughtful design and community collaboration. V3 was instrumental in the site design, …

View ProjectParker Civic Center

Highland Park Apartments

This modern mixed-use residential complex offers high-quality living spaces with convenient access to urban amenities.

View ProjectHighland Park Apartments

North Street Reconstruction & Integrated Stormwater Management

The North Street project not only addresses stormwater management but also serves as a catalyst for neighborhood revitalization and economic …

View ProjectNorth Street Reconstruction & Integrated Stormwater Management

The Vision to Transform with Excellence.

Celebrating 40+ years of transforming careers, communities, and environments.

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Denver, CO
Chicago, IL
West Chicago, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC
Pinehurst, NC

Cincinnati, OH
Columbus, OH
Greenville, SC
Sherwood Park, AB

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2025 V3 Companies | Privacy Policy