• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Healthcare
    • International Development
    • Local Government
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

City of Geneva’s South Street Bridge Emergency Superstructure Replacement Project Wins APWA Fox Valley Branch Project of the Year Award

February 5, 2020
BEFORE & DURING CONSTRUCTION

City of Geneva’s South Street Bridge Emergency Superstructure Replacement Project was selected to receive the Project of the Year Award in the category: Disaster or Emergency Construction/Repair (Less than $5 Million) for the Fox Valley APWA Branch. 

The City of Geneva identified concerns regarding the South Street Bridge and upon V3 conducting a structural inspection and evaluation, it was determined the bridge had deteriorated to where it needed to be closed immediately for public safety. Lacking advance warning to the public and with South Street being a main thoroughfare, the City wanted to conduct repairs and reopen the bridge as quickly as possible. Upon evaluating options, it was determined that the most efficient, cost-effective solution was to replace the bridge.

V3 proposed an expedited schedule to design the replacement and execute the construction under an open book, at-risk construction management delivery. This allowed V3 to allocate resources for the demolition of the existing bridge and line up the required trade contracts concurrent with the design progress. Construction authorization was given in October, work commenced immediately and the bridge was reopened on November 19.

AFTER CONSTRUCTION
Category: Awards

Sidebar

Recent Posts

  • V3 Southeast Expands into New Charlotte Office
  • Celebrating Our 2023 Summer Interns for National Intern Day
  • Celebrating Women in Engineering
  • Three new members have been elected to V3 Companies’ Board of Directors
  • V3 is named IREJ’s 2023 Engineering Firm of the Year!

Categories

  • Articles
  • Awards
  • Charlotte
  • Chicago
  • Life at V3
  • Miscellaneous
  • Out & About
  • People
  • Projects
  • Thought Leadership

The Vision to Transform with Excellence.

Celebrating 40 years of transforming careers, communities, and environments.

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Chicago, IL
Villa Park, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC

Cincinnati, OH
Columbus, OH
Sherwood Park, AB
Port-au-Prince

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2023 V3 Companies | Privacy Policy