![](https://www.v3co.com/wp-content/uploads/2023/08/sheetz2-enhanced2-enhance-400x300.jpg)
Sheetz
As the first Sheetz restaurant and fuel center in Central Ohio, our team coordinated with multiple stakeholders to ensure the new site met all of the …
![](https://www.v3co.com/wp-content/uploads/2023/08/IMG_0004-400x300.jpg)
Hebron Hydrologic & Hydraulic Floodplain
The Village of Hebron partnered with our team to address heavy flood events frequently affecting their community.
![](https://www.v3co.com/wp-content/uploads/2023/08/IMG_9707-400x300.jpg)
West Water Street Reconstruction
The Village of Baltimore, OH wanted to improve a 0.3-mile roadway alongside its local fire station and Liberty Union High School by providing …
![](https://www.v3co.com/wp-content/uploads/2023/12/IMG_5889-400x300.jpg)
Leonard Park Drainage Improvement Study
With a recent increase in demand for buildable lots within the subdivision, the Franklin County Engineer’s Office hired our team to perform a flood …
![](https://www.v3co.com/wp-content/uploads/2023/07/20180906_150133-400x300.jpg)
Danville Wastewater Treatment Facility
As the Village of Danville’s wastewater treatment facility approached 25 years old, the Ohio EPA imposed new discharge limits on the facility …
![](https://www.v3co.com/wp-content/uploads/2023/07/Hope-Dr_Construction-400x300.jpg)
Hope Drive Extension
The Village of Hebron needed secondary roadway access to a large residential development, as the previous access point experienced frequent flooding. …
![](https://www.v3co.com/wp-content/uploads/2023/07/20210420_103259_resized-400x300.jpg)
Rager Road Waterline, Sanitary Sewer & Lift Station
Our municipal services team in Columbus provided design and permitting for the Rager Road Waterline, Sanitary Sewer & Lift Station, a $1.4-million …
![](https://www.v3co.com/wp-content/uploads/2023/12/SEA3-400x300.jpg)
SEA II Buffalo Parkway
Located on 19 acres near the Anheuser-Busch Brewery, this project required extensive services from our team, including site plan design, site grading, …
![](https://www.v3co.com/wp-content/uploads/2023/08/N264-Completed-400x300.jpg)
Kroger
A struggling retail development in Lancaster, OH needed major redevelopment to meet the demands of modern shoppers. The property was underutilized, …
![](https://www.v3co.com/wp-content/uploads/2023/08/BE3C5D9E-15B4-48CD-B9F2-A2305EACEA5C-400x300.jpeg)
Stillwell Jerome
This 20-acre build-to-rent community—located in the master-planned Jerome Village Development—was intentionally designed with as much common park …
![](https://www.v3co.com/wp-content/uploads/2023/08/Bridge-over-Gordan-Creek-400x300.jpg)
Billinger Stream Stabilization
The Billinger Stream in Paulding, OH needed attention as its banks were in jeopardy. Increased localized sedimentation into the creek was causing …