• Skip to main content
  • Skip to header right navigation
  • Skip to site footer
V3 Companies

V3 Companies

The Vision to Transform with Excellence

  • Our Story
    • Our Story
    • Life at V3
    • Leadership
  • Markets
    • Education
    • Healthcare
    • Local Government
    • Mixed Use
    • Office & Industrial
    • Parks, Recreation & Conservation
    • Residential
    • Retail
    • Transportation
    • Power & Energy
  • Projects
  • Services
    • Construction Engineering
    • Contracting & Construction Management
    • Ecological Restoration
    • Environmental
    • Highways & Traffic
    • Landscape Architecture
    • Municipal Consulting
    • Planning
    • Railroads
    • Resilient Water Solutions
    • Site Civil
    • Structural
    • Surveying
    • Wetlands & Ecology
  • Careers
  • News
  • Contact

Navigating a Multiyear Main Street Modernization

September 26, 2024

Historic main streets are the heart of any downtown, but without updated infrastructure, a beloved thoroughfare can quickly turn into an unsafe artery. Discover how our transportation engineers are leading Lac La Biche’s Main Street through an ambitious revitalization that will improve accessibility, decrease congestion, and boost aesthetic appeal on every block.   

Stuck in the slow lane

Hugging the scenic curves of northeastern Alberta, Canada is the Hamlet of Lac La Biche, a charming community led by the motto “welcoming by nature”. The downtown main street area boasts a vibrant collection of small businesses, restaurants, and more, but as the area enjoyed rapid growth, outdated infrastructure began to block future development. Uneven sidewalks and congested parking areas made the street difficult to navigate, while constant winter watermain breaks, drainage problems, and aging utilities were putting a strain on county repair crews.

In order to best serve residents and tourists alike, the Lac La Biche Council sought out an ambitious revitalization effort to not only address structural issues but also enhance the beauty and overall community experience of everything Main Street has to offer.

Getting the green light

V3 answered the call to bring back functionality and aesthetic appeal to downtown Lac La Biche. As part of the multiyear Main Street Revitalization Project, our team has provided transportation and municipal engineering services, as well as planning expertise, to support these efforts. 

Work began with extensive community engagement to understand the needs and concerns of the community. From there, our planning team created a detailed report mapping out design elements, design products, a construction cost estimate, and proactive recommendations related to overcoming construction challenges.

Proposed improvements included:

  • Utility: Replacement of 900 meters of watermain, 400 meters of sanitary sewer, 60 lot services, replacement of 830 meters of sanitary sewer, and the addition of 500m of new storm sewer mains.
  • Surface: 1,500 meters of curb, 13,000 square meters of standard and decorative sidewalk, and 17,000 square meters of asphalt.
  • Streetscape: Boulevard trees, landscape beds, entrance columns, outdoor speakers, lighting, and traffic calming measures.

The plan was approved in 2022, with construction activities divided into three phases—tackling one block at a time—so as to minimize disruption to local businesses.

Keeping both eyes on the road

The V3 team has been a constant Main Street presence since construction began. Being on site and connecting with the community has allowed us to assess any challenges and address new ideas in real time.

Our constant engagement with affected businesses and County administration educated us on the preferences and needs of the community. This led us to implementing an adaptive strategy for traffic and pedestrian accommodations and communicating with the public. Over the course of the first year, we implemented increased signage, business directories, pedestrian routes, and public engagement sessions that went well beyond typical accommodation needs on a project of this nature. Well into the second year, we have seen a greatly improved attitude from the businesses, and the construction work is ongoing with reduced business impacts.

During construction, our on-site representation and active problem solving is a constant requirement when replacing aging infrastructure. There have been many instances of revised utility designs, improved surface grading, and reconfiguration of surface improvements to work with the on-site conditions that may not be known until construction starts. These changes are made to align with best Engineering practices, improved operation and maintenance for the County, reduced project costs, and improve the functionality for the community.

The first construction phase was completed in 2023. When Phase 2 kicked off in 2024, we were able to use our deep understanding of the area to create efficiencies and get ahead of known issues. As work continues, we look forward to the improved safety, beautification, and all-around livability the completed revitalization will bring.

“This project has been my favourite challenge I’ve worked on in my career. With the age of the infrastructure, and the variety of building vintages, every day faces you with a new problem to solve. It has also been a great experience in collaborating with so many partners, subconsultants, contractors, and stakeholders in the project. We regularly interact with our own planning and transportation teams, landscape architects, electrical and structural engineers, utility companies, and the local businesses and members of the public in Lac La Biche. Out of all of the projects I’ve work on in Lac La Biche County over the last eight years, Main Street is going to leave the most meaningful imprint on the community and its visitors. I hope to be able to visit Lac La Biche in the future and experience a vibrant Main Street enjoyed by tourists and locals alike.”

Adam Boyko, Construction Services Coordinator

Work with V3’s Transportation experts

Developing safe and efficient transportation systems takes experienced leadership and a creative approach. We offer sensible solutions to meet the unique challenges of each project based on a combination of foresight, industry standards, and best practices. Connect with our team to learn more.

Category: Transportation, Edmonton, Projects

Sidebar

Recent Posts

  • Meet Donna Allspach – Celebrating 40 Years with V3
  • Meet Trevor Hansen – Landscape Architecture & Land Planning Project Manager
  • Ask an Expert: How Do I Determine Go/No Go on a Property?
  • V3 Joins Forces with KoontzJones Design
  • 2025 Q1 Employee Enrichment Wrap Up

Categories

  • Articles
  • Ask an Expert
  • Awards
  • Careers
  • Carolinas
  • Charlotte
  • Chicago
  • Columbus
  • Construction
  • DEIB
  • Ecological Restoration
  • Edmonton
  • Employee Enrichment
  • Environmental
  • Greenville
  • Heavy Construction
  • Indianapolis
  • Land Development
  • Landscape Architecture
  • Life at V3
  • Miscellaneous
  • Municipal Consulting
  • Nature Based Solutions
  • News
  • North Carolina
  • Out & About
  • People
  • Pinehurst
  • Planning
  • Projects
  • REVITALIZE
  • Self-Perform Construction
  • Site Civil Engineering
  • South Carolina
  • Southeast
  • Structural Engineering
  • Survey
  • Technology
  • Thought Leadership
  • Transportation
  • VSR
  • Water
  • Wetlands and Ecology

Archives

  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • April 2022
  • March 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • August 2021
  • June 2021
  • April 2021
  • February 2021
  • January 2021
  • October 2020
  • September 2020
  • July 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • June 2019
  • March 2019
  • February 2019
  • December 2018
  • October 2018
  • July 2018
  • June 2018
  • April 2018
  • February 2018
  • January 2018
  • December 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • March 2017
  • February 2017
  • September 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016

Categories

  • Articles
  • Ask an Expert
  • Awards
  • Careers
  • Carolinas
  • Charlotte
  • Chicago
  • Columbus
  • Construction
  • DEIB
  • Ecological Restoration
  • Edmonton
  • Employee Enrichment
  • Environmental
  • Greenville
  • Heavy Construction
  • Indianapolis
  • Land Development
  • Landscape Architecture
  • Life at V3
  • Miscellaneous
  • Municipal Consulting
  • Nature Based Solutions
  • News
  • North Carolina
  • Out & About
  • People
  • Pinehurst
  • Planning
  • Projects
  • REVITALIZE
  • Self-Perform Construction
  • Site Civil Engineering
  • South Carolina
  • Southeast
  • Structural Engineering
  • Survey
  • Technology
  • Thought Leadership
  • Transportation
  • VSR
  • Water
  • Wetlands and Ecology

The Vision to Transform with Excellence.

Celebrating 40+ years of transforming careers, communities, and environments.

Home
Our Story

Life at V3
Leadership
Services

Markets
Projects
Careers
News
Bids

Contact Us


Denver, CO
Chicago, IL
West Chicago, IL
Woodridge, IL
Carmel, IN

Indianapolis, IN
Martinsville, IN
South Bend, IN
Charlotte, NC
Pinehurst, NC

Cincinnati, OH
Columbus, OH
Greenville, SC
Sherwood Park, AB

  • Facebook
  • LinkedIn
  • Instagram

Copyright © 2025 V3 Companies | Privacy Policy