Elgin O’Hare Western Access (Illinois Route 390 & I-490 Tollway)
As part of the Illinois Tollway’s $1.6 billion reconstruction of the I-90 East Corridor from the Elgin Toll Plaza to the Kennedy Expressway, our team …
![](https://www.v3co.com/wp-content/uploads/2024/06/DSC02238-400x300.jpg)
Metra Union Pacific North Line Improvements
This award-winning project included construction management for the reconstruction of 11 bridges, 1,000 feet of retaining wall, and a new passenger …
![](https://www.v3co.com/wp-content/uploads/2023/08/P1020760-2-web-400x300.jpg)
37th Street Sewer Improvements
The 37th Street sewer project was part of Chicago’s ambitious $7-billion “Building a New Chicago” infrastructure improvement program.
![](https://www.v3co.com/wp-content/uploads/2023/08/2015-11-05-14.15.44-400x300.jpg)
St. Charles Road Bridge
The St. Charles Road bridge was suffering from deterioration, leaving it in poor condition for travelers crossing the Salt Creek.
![](https://www.v3co.com/wp-content/uploads/2023/08/Schoolhouse-Road-facing-northedit-1-400x300.jpg)
US Route 30 Reconstruction
This $90-million project for the Illinois Department of Transportation included the reconstruction and widening of 8.5 miles of US Route 30 from a …
![](https://www.v3co.com/wp-content/uploads/2023/08/IMG_4248-400x300.jpeg)
Combined Sewer Overflow Longterm Control Plan Wet Weather Treatment
This $33.4-million project is the current phase of the City of Joliet’s Combined Sewer Overflow Long Term Control Plan to remedy issues within its …
![](https://www.v3co.com/wp-content/uploads/2023/08/UnionStationCTA_329-400x300.jpg)
Union Station Transit Center
Union Station is Chicago’s major transportation hub. To further support commuters and travelers, our team provided construction engineering services …
![Main Street Lac La Biche Revitalization](https://www.v3co.com/wp-content/uploads/2023/12/Main-Street-Screen-Capture-3-400x300.jpg)
Main Street Lac La Biche Revitalization Project
Our team developed a Main Street beautification and infrastructure upgrade plan to revitalize downtown Lac La Biche, including extensive utility …
![](https://www.v3co.com/wp-content/uploads/2023/12/IMG_8161-400x300.jpg)
Central Avenue Reconstruction & Sewer Separation Improvements
This award-winning project addressed extensive separation of sanitary from storm sewers throughout the Village, overcoming many challenges along the …